How to answer “what are you working on?”
How to answer “what are you working on?” in a meeting or stand-up: lead with the one thing that matters, then status and next step. Three sample answers.
By Malav Shah, founder of Meenu · Updated
Short answer
To answer “what are you working on?”, name the one thing that matters most, say where it stands, and give the next step or what you need. Keep it under 30 seconds. Skip the history of how you got there. If someone wants more detail they will ask, and a short first answer leaves room for that question.
Key takeaways
- Lead with the work, not the background: the thing, its status, the next step.
- Thirty seconds is enough for a status answer. Longer usually means you are telling the story of the week.
- Name a blocker plainly. “I need X from Y by Thursday” is the most useful sentence in a stand-up.
Why is “what are you working on” hard to answer?
Because you know too much. You remember every task from the week, so the answer comes out in the order it happened: the meeting on Monday, the bug on Tuesday, the thing you are waiting on. The listener wants the opposite order: what matters now, and whether anything is stuck.
It also sounds casual, so people do not prepare it. A manager in a corridor, a skip-level in a one-to-one, a stranger at an event: all of them ask the same question and judge the answer in the first sentence.
What structure works for a status answer?
Three parts, in this order. Each is one sentence.
| Part | What to say | Example |
|---|---|---|
| The thing | The one piece of work that matters most this week | “I'm on the new checkout page.” |
| Where it stands | Done, on track, or behind, with one fact | “Design is signed off and the build is about half done.” |
| Next step or need | What happens next, or what you need from whom | “I need the final prices from finance by Thursday.” |
It is the same rule as any answer at work: the point first, then the context. Our guide on how to stop rambling explains why that order works.
What are good sample answers?
When the work is on track
“I'm on the new onboarding emails. Four of the six are written and the last two go to review tomorrow. Next week I start testing them with a small group.”
When the work is behind
“Mostly the data migration. It's about a week behind because the old records have more duplicates than we expected. I've got a fix, but I need an hour with Priya to check it before we run it.”
When someone outside your team asks
“I lead a small team that builds the mobile app for a bank. Right now we're making it faster to send money abroad. It's fun because the hard part is trust, not code.”
Notice what the third answer adds: one line on why it is interesting. With people who do not share your context, that line gives them something to ask about.
How do you answer it in a daily stand-up?
The Scrum Guide sets the Daily Scrum at 15 minutes for the whole team, and says its purpose is to inspect progress toward the sprint goal and plan the next day.[1] It does not prescribe the familiar three questions; teams choose their own format. Whatever the format, the time is shared, so your part is short.
- Start with progress toward the goal, not a list of everything you touched.
- Say blockers as a request with a name and a time: “I need the API key from Sam today.”
- Take detailed discussion after the stand-up with the people who need it.
How do you practise answering it?
Say it out loud, once, before the meeting. Time it. If it runs past 30 seconds, cut the history and keep the thing, the status and the next step. Then listen back for how long it took to reach your point: if the first ten seconds are background, start one sentence later.
Meenu asks this exact question in its free speaking check and in daily practice, then shows where your point arrived and gives you a clearer version of your own answer.
Frequently asked questions
How long should my answer be?
About 20 to 30 seconds in a meeting or a corridor. In a stand-up, follow the team's habit, but keep to progress, next step and blockers.
What if I am working on lots of small things?
Pick the one that matters most to the person asking and lead with it. Then say “plus a few smaller things” and stop. They will ask if they want the list.
Should I mention problems?
Yes, briefly and with what you need. “It's a week behind because of X; I need Y to fix it” is more useful than sounding fine and surprising people later.
How do I answer if I am not working on much?
Say what you finished and what you are picking up next. “I wrapped up the report on Tuesday and I'm scoping the next project” is honest and still sounds in control.
Sources
- Ken Schwaber and Jeff Sutherland, “The Scrum Guide (2020)”, checked 21 November 2026.